Providence College Campus Project Updates

​​​​​​​​​​​​​​​​​7/21/2017 - Moore Hall Renovations

​​Demo work on Moore Hall has begun.  Walls between the three lecture halls, and sloped concrete floors have been removed. On the right you can see where original windows were blocked in. ​

MooreHalldemo1.jpg

​​7/21/2017 - Huxley Avenue Transformation Overlook Construction

​​​The granite veneer install on the overlook has begun.​ Workers are putting on the granite veneer to the back radial walls of the overlook. 

​​​overlookgraniteveneerweb.jpg

overlookandstairsweb.jpg

07/19/2017 - Science Complex

​​ In just over ​a day, much of the steel has been erected. Here iron workers attach cross beams and the first floor begins to take​​ shape.​

sciencecomplexsteelweb2376.jpg

07/13/2017 - Science Complex

​Foundation walls for the Hickey Hall addition are formed and being poured​.

hickeywalladditionweb.jpg

​The Science Complex Addition lower level slab is almost ready to be poured. The wire mesh shown will act as reinforcement within the concrete slab​.

hickeyslabweb.jpg

​​07/13/2017 - Huxley Avenue Transformation - Overlook

​​​Foundations for the Overlook have been poured and are awaiting finish work.​

overlookweb.jpg​​​

7/12/2017​ - Calabria Plaza

Teams remove forms on the Calabria Torch wall revealing the poured radius wall​.

plazawallweb.jpg

7/10/2017 - Huxley Transformation Phase B

​​Huxleywalwebl.jpg

​​​​​​6/9/2017 - Huxley Transformation Phase B

The granite veneer has begun to be installed along the radial walls at the Huxley/Eaton intersection.  Seat wall foundations have been poured around Glay Field.  This will be a great place to sit and watch the Friars.

HuxleyTransP2wallimage1.jpghuxleyseatwallP2image5.jpg

Looking north between Guzman and Glay Field the old Huxley Ave is no longer recognizable.  The old Guzman hill is no longer. Looking forward to an improved walk up hill come September​​​​.

HuxleytransP2northroad3.jpghuxleytransP2guzmanhillimage4.jpg

​​​​​​​​​​​​6/8/2017 Lennon Family Artificial Turf Field

​​The Lennon Field is getting a much needed resurfacing.  A new e-layer, which provides cushioning , is being placed now​ before the new turf can be put down.

Lennonresurface.jpg


​​​2/27/2017 - Huxley Transformation Video Update


 

​ ​​